The project of a cascade of small hydroelectric power plants on Issyk-Kul was launched in Turgen May 31, 2025
The deputy demanded to speed up the construction of a HPP on the Altyn-Dara river May 30, 2025May 30, 2025
Kazakhstan Ust-Kamenogorsk HPP is switching to digital technologies Everyone from school has a rough idea of how a hydroelectric power plant works. The dam blocks the river, creates a difference between the lower...