Five small hydroelectric power plants will be built in Kyrgyzstan this year
Five small hydroelectric power plants with a total capacity of 64 MW are planned to be commissioned in Kyrgyzstan in 2025. This was announced by...
CASA-1000: Kyrgyzstan has completed its stage of the energy export project
Kyrgyzstan has announced the completion of its part of the work within the framework of the large-scale international energy project CASA-1000 in Central Asia. The...
The future cascade of hydroelectric power stations on the Uba River has acquired strategic importance
The cascade of hydroelectric power plants (HPPs) on the Uba River in the East Kazakhstan region is included in the list of strategically important water...
In the east of Kazakhstan they want to build 90 small hydroelectric power stations on 22 rivers
According to Vice Minister of Energy of the Republic of Kazakhstan Sungat Yessimkhanov during a meeting with residents of Ridder, the government is considering the...
Ust-Kamenogorsk HPP is switching to digital technologies
Everyone from school has a rough idea of how a hydroelectric power plant works. The dam blocks the river, creates a difference between the lower...
Management of the Irtysh: floods, modernization of hydroelectric power stations and the fate of the river
Floods are, according to specialists of the Ust-Kamenogorsk HPP, a key stage related to water level regulation, ecosystem protection and safety. As noted by Svetlana...
“Green” energy at the cost of destroying rivers: the hidden threat of hydropower
The recent report of the International Renewable Energy Agency (IRENA) "Renewable Capacity Statistics 2025" paints a rather optimistic picture of the development of renewable energy...
Isfara will become the river of friendship of the Central Asian countries
From now on, residents of the border regions of Kyrgyzstan and Tajikistan will jointly use water and energy infrastructure facilities located on the border territories...
The construction of a hydroelectric power station is changing the landscape near the Papan reservoir
In the Kara-Sui district of the Osh region of Kyrgyzstan, work is underway that foreshadows another human intervention in river ecosystems: construction of access roads...
EDB to finance Pre-TEO for Suusamyr-Kokomerensky cascade of HPP
The Ministry of Economy and Commerce of Kyrgyzstan and the Eurasian Development Bank (EDB) signed an agreement on the provision of technical assistance. The purpose...