The construction of the Orto-Tokoyskaya HPP in Kyrgyzstan has been completed by 68% September 17, 2025
The first hydroelectric power station from the cascade was put into operation on the Naryn River September 17, 2025
Hydropower for their own: how is the business at the HPP connected with the authorities in Kyrgyzstan September 16, 2025
A small hydroelectric power station on the Damarik canal was launched in the Tashkent region September 13, 2025
Kyrgyzstan Japan was invited to the construction of the Kambar-Ata HPP-1 Kyrgyzstan and Japan are discussing the expansion of cooperation in the energy sector. During the meeting of the Minister of Energy of the Kyrgyz Republic...