The strategic cascade of HPPs in the east of Kazakhstan will be handed over to private owners
The cascade of hydroelectric power stations (HPPs) in the East Kazakhstan region is to be included in the number of strategic facilities transferred to private...
Five hydroelectric power stations will be built in East Kazakhstan by 2030
Akim of the East Kazakhstan region Yermek Kosherbayev reported on the measures taken to transition to a "green economy" to the Prime Minister of Kazakhstan...
Are the regions of Kazakhstan ready for floods?
Winter is in full swing, which means that the next spring floods are not excluded. What are the akimats of the affected regions of Kazakhstan...
This year, Balkhash, Caspian and Aral received record volumes of water
This year, a record amount of water was collected in the reservoirs of Kazakhstan – more than 75 billion cubic meters. Of these, more than...
How does the Moynak hydroelectric power station affect the Charyn Ash grove
In 2012, the Moynak hydroelectric power station with an installed capacity of 300 MW was commissioned on the Charyn River in the Raiymbek district of...
Local residents are concerned about the construction of a dam on the Koksu River
In the Zhetysu region of the Republic of Kazakhstan, a discussion was held on the construction of a hydroelectric power station (HPP) on the Koksu...
The construction of two dams on the Koksu River has been suspended
After a number of publications in the media, social networks, as well as after our investigation, the public outcry seems to have become so strong...
A flood forecasting system is being developed in Kazakhstan
On behalf of the President of the country, an information system for forecasting and modeling floods Tasqyn is being developed in Kazakhstan. The system will...
Small hydroelectric power plants begin to destroy the mountain rivers Zhetysu
Since the beginning of this year, scandals around the construction of small hydroelectric power stations on the rivers Kora, Chazha and Koksu have not subsided...
Tasotkelskoye and Teris-Aschybulakskoye reservoirs will be filled to 100%
By April 2025, the Ministry of Water Resources and Irrigation of the Republic of Kazakhstan plans to fill the Tasotkel and Teris-Ashybulak reservoirs in the...
